JRS/Hard Rock Stadium Renovations, Phase II.... | Page 30 | FinHeaven - Miami Dolphins Forums

JRS/Hard Rock Stadium Renovations, Phase II....


The Dolphins plan to build pedestrian tunnels to enable fans parking in the outer lots to walk to and from the stadium unimpeded. That will enable a constant flow for drivers into and out of the main lots. Currently, police constantly stop vehicular traffic so fans on foot can cross Dan Marino Boulevard (to the south of the stadium) and Don Shula Drive (to the east).

I was always wondering why they never put bridges in or retrofitted with bridges going across the inner parking lots. But hey, a tunnel is even better.
 
He had to sign it?
Great, another curse. :lol:

The construction crew signed it along with others. Maybe someone scribbled over his John Han****. :lol:


CojIA9KWIAQbQG8.jpg
 
Back
Top Bottom